1. After the machine opened the box, first check whether the random technical data is complete, the machine is in transit damage, in order to solve in time.
2. The feed assembly and the discharging assembly are installed and adjusted according to the outline diagram in this specification.
3. The lubricating points to be new lubricants.
4. Rotate the machine with the rocker handle to check whether the machine is running correctly (facing the motor spindle counterclockwise), the machine must protect the ground.